Reconstruction of the 110/35/10 kV substation of Ülejõe



Location

Description of work

Other

Status

Time of completion


Buildings
Civil engineering
Concrete works

In the course of the substation reconstruction, a new switchgear of 110 kV was constructed and a new 25 MVA power transformer of 110/35/10 kV was installed and connected to an overhead transmission line. A new control building was constructed and the old part of the substation was dismantled and demolished. The procurement included also the replacement of current transformers and the establishment of differential protection relaying equipment in Anne substation.

On 1 July 2021, Merko Ehitus Eesti acquired a stake in Connecto Eesti, and the Merko electrical construction business line merged with Connecto. Acting jointly under the Connecto brand makes it possible for us to offer a significantly broader range of services – in addition to the design, construction and maintenance of low, medium and high voltage electricity networks, Connecto also operates in the field of telecommunications and gas networks.

View the works performed by Connecto.

Client:
OÜ Põhivõrk
Name of the project:
Reconstruction of the 110/35/10 kV substation of Ülejõe
Category:
Civil engineering
Type of construction:
Power infrastructure
Description of work:
Reconstruction
Country:
Estonia
Address:
Roosi str 80, Tartu
Beginning of the project:
2005
Year of completion:
2007