Replacement of three Tallinn 110kV overhead lines with cable lines



Buildings

Civil engineering

Energy supply

Concrete works


Location

Description of work

 

 

 


Within the framework of the contract, the cable line will replace the 110-kV overhead line between Kadaka and Veskimetsa substations in Tallinn. The cable line will partially replace the 110-kV overhead lines between Harku and Veskimetsa and Harku and Kadaka substations. The total length of the cables to be installed is approximately 10 kilometers. The construction of new high-voltage cables will improve the security of supply in the Mustamäe and Haabersti districts and in the vicinity of Tallinn. As the existing overhead lines will be dismantled after the installation of new cables, the visual impact of overhead lines in Õismäe and Astangu areas on urban space will be reduced.

Both open and closed methods are used for cable installation. The underground cable is laid over the entire route to a depth of 1.5-6 meters. After the work is completed, the asphalt pavement of the carriageway and sidewalks will be restored, and thousands of square meters of greenery will be built.

The work is carried out by the consortium AS Merko Infra and Connecto Eesti AS.

Client:
Elering AS
Name of the project:
Replacement of three Tallinn 110kV overhead lines with cable lines
Category:
Energy supply
Type of construction:
High voltage networks – power cables and overhead lines
Cooperation partner:
Connecto Eesti AS
Description of work:
New building
Country:
Estonia
Address:
Kadaka road 42e, Tallinn
Beginning of the project:
2019
Year of completion:
2020