• Office building Öpiku maja, tower A

    Ülemiste City is launching the development of the largest office building in Estonia – a 44,000 square metre twin tower. Merko has erected the first building of the twin towers with an area of 22,000 square metres. The new impressive office building will be named the Öpik Building after Ernst Julius Öpik, an internationally recognised …


  • Renovation of the Otepää water and sewerage network

    4,786 m of water pipelines; 3,051 m of sewerage pipelines; 1,408 m of pressurized sewerage; 7 waste water pumping stations, each one 5 l/s (18 m³/h); Renovation of 3 bore well pumping stations along with water treatment stations:Mäe water intake – water treatment station with a throughput of 110 m³/h, reservoirs 4×110 m³Kopli bore well …


  • Emajõgi and Võhandu river basin water resources management project; Emajõgi sub-project. Phase II of design and construction work on water and sewerage infrastructure. Part 1: Water and sewerage infrastructure in Nõo municipality

    6.2 km of water pipelines;7.2 km of sewerage pipelines;1.3 km of pressurized sewerage pipelines;2 new waste water treatment stations: Tõravere 28.7 m³/d, 221 PE, Nõgiaru 15 m³/d, 115 PE;1 renovated waste water treatment station: Luke 21.5 m³/d, 165 PE;3 waste water tanks: Tõravere 30 m³; Nõgiaru 20 m³; Luke 20 m³;4 water treatment stations: Tamsa …


  • Construction work on Rannamõisa road and Rõugu street

    The objective of the work was to establish water pipelines along Rannamõisa road – in order to supply the registered immovable at Pikaliiva str 92 with drinking water – and to establish external networks for the apartment buildings being planned on the plot at Rõugu str 2, Tallinn. • Installation of 1,511 m of water …


  • ECCUA production and storage building

    The building has a simple, functional plan: it comprises an integral one-storey production and storage facility and a compact two-storey block of offices and non-work rooms. The production and storage facility has a reinforced concrete framework and sandwich panel walls. The foundation is made up of reinforced concrete sockets to support the framework and a …


  • Apartment building at Paepargi 49

    Merko has launched the fourth phase of the Paepargi apartment development and started the construction of the first of three buildings, located at Paepargi 49 and is completed in late 2015. The 14-storey building has 60 flats, with two especially luxurious penthouse apartments on the top storey, featuring high ceilings, spacious terraces, a great view, …


  • Apartment building at Rästa str 18

    The five-storey building has an elongated footprint. The part of the building that lies along Sõpruse puiestee is broken up horizontally with moderately recessed and projecting sections. The floor plan is as functional and compact as possible given the size and proportions allowed under the detailed plan. Retail spaces and three residential units are to …


  • Construction work on infrastructure for diverting excess water in the small town of Aruküla and village of Kurgla in Raasiku rural municipality

    Before this construction contract was performed, the system for diverting runoff in Aruküla was practically non-functional – in some places there was approx. 40-60 cm of standing water in spring. In the course of the construction work, perforated drainage pipelines were installed in a semi-circle in Lepa, Männiku, Kaasiku and Jaama streets. These pipelines collect …