Estonia
-
Water and sewerage project of Matsalu sub-basin
The design and construction work in the Matsalu sub-basin’s water and sewerage project was performed in two parts. Stage 1 covered Märjamaa and Vigala municipalities’ water and sewerage infrastructure, in which a total of 27.5 km of water pipelines, 35.3 km of sewerage pipelines, 9.4 km of pressurized sewerage pipelines, 30 waste water pumping stations, …
-
Port of Piirissaare
The port of Piirissaare, which was completed in July 2010, is located in the southern part of Lake Peipsi, in the middle of Piirissaare island, which is situated in Lämmijärv, and is connected with the lake by a 1.6 km long entry canal. The port is used during ice-free periods for keeping in touch with …
-
Emajõgi and Võhandu river basin water resources management project; Emajõgi sub-project. Phase II and III of water and sewerage works in the city of Elva. Part 1: Water and sewerage infrastructure in the northern and central part of the city of Elva and in the settlement of Käärdi
In the town of Elva, AS Merko Ehitus constructed and reconstructed altogether 34.7 km of water pipelines, sewers, pressure sewers and storm sewers. 10 new sewage pumping stations were installed and one reconstructed. In addition, five wells for measuring drinking water and two water pressure booster stations were installed. In the framework of the same …
-
Reconstruction of the area between 1st and 2nd quay of Port of Roomassaare
In the course of the renovation work, a 76.3 meter long dock with a steel enclosing wall and monolithic concrete edge beam was built. The underwater part of the quay to be constructed was deepened to a height of about 5.5 metres. The dredging volume was 4,200 m3.
-
Construction of water and sewerage pipeline of Kilingi-Nõmme
4.6 km of water lines 4.2 km of sewerage lines
-
Construction of northern breakwater of Abruka port
The northern breakwater at Abruka port was built, with a total length of 100 metres. An approx. 25 metre long underwater slope between the granite-stone breakwater and shore ramp was reinforced.
-
Small ship port of Heltermaa
Small ship port of Heltermaa, which was completed in June 2010, is located on the western side of the port of Heltermaa. In order to protect the small ship port, a mole of 177 m was constructed and the port’s water basin was dredged to -2.5 and -3.0 metres. The port has two floating berths …
-
-
Construction works of water and sewerage utility lines of Kose rural municipality
13.4 km of sewerage 14 km of water pipe 8 waste water pump stations
-
Ämari Air Base
In April 2008, the Ministry of Defence declared the first and most extensive construction procurement for the renovation works of Ämari Air Base, co-financed by the Republic of Estonia and NATO, in order to reconstruct the movement area of the air base. The movement area projects amounted to 70% of the scope of the works …