Estonia
-
Sviby Harbour
Renovation of the ramp. Expansion of the waiting area and causeway 2530 m2. Building shoreline reinforcements.
-
Water and sewerage construction works of Olgina small town
About 6.6 km of water, sewerage and storm water sewerage pipelines were laid. A new 300 m3/day water treatment plant including water reservoirs was built.
-
Construction work on stage II of the Pärnu City Centre district water resources management sites. Part 3: City Centre/Vingi Street
2.4 km of water pipelines, 2.2 km of sewerage pipelines, and 2.0 km of storm water sewerage pipelines were designed and built.
-
Construction work on stage II of the Pärnu city centre water resource management facilities. Part 2: Karjamaa Str and Side Str. Part 5: City Centre/Side Str
7.8 km of water pipelines, 6.9 km of sewerage pipelines, and 7.3 km of storm drain pipelines were designed and built.
-
Design and construction of pipelines in Leppneeme village
16 km of water and sewerage pipelines were designed and built (including 8.8 km of water pipelines, 2.1 km of sewerage pipelines), 1.1 km of pressurized sewerage pipelines, 3.9 km of suction sewerage pipelines, 2 waste water pumping stations and 1 suction sewerage pumping station.
-
Design and construction of pipelines in townships and villages in Viimsi municipality. Part 1: Design and construction of pipelines in Viimsi township
8.9 km of water and sewerage pipelines, and 1 waste water pumping station were designed and built.
-
Design and construction of the renovation of the Pärnu Mere pst waste water pumping station
During construction, three new pumps were installed (pumping station’s total volumetric flow rate 450 l/sec, two pumps operating), new suction and pressurized pipelines were installed in the necessary scope, and new shutoff valves and retaining valves were installed. In addition, the pumping station’s collection tank was also reconstructed (including an inflow channel and the ceiling …
-
Renovation of public water supply and sewerage systems in Põltsamaa, Kolga-Jaani and Pajusi municipality – pipelines. Part 1 of the design and construction work: Renovation and construction of water and sewerage pipelines and waste water pumping stations in Põltsamaa municipality settlements
9.8 km of water pipelines, 10.3 km of sewerage pipelines, and 4 waste water pumping stations were designed and built in Adavere, Kamari, Lustivere and Esku settlements.
-
Stage II of construction work on Pärnu city centre water resources management facilities – Liiva
1.8 km of water pipelines, 2.3 km of sewerage pipelines, 1.3 km of storm water pipeline, and 1 waste water pumping station were built.
-
Design and construction work on the water supply and sewerage pipelines and infrastructure in the EU Cohesion Fund waste management project for the Viru-Nigula waste water intake area
3.4 km of water pipelines, 4.2 km of sewerage pipelines, 1 waste water pumping station, 1 waste water treatment plant with output of 180 m³/day, 1 bore well pumping station with water treatment plant and level 2 pump station were designed and built. A bore well pumping station was renovated.