• Vilnelės skverai residential quarter, stage III

    The third stage of the development included eight apartment buildings with 303 apartments. The 6- and 7-storey buildings located at address Manufakturu str. 7 will have the energy class rating A+. All apartments will have spacious balconies or terraces and will be equipped with heat-recovery ventilation system, providing fresh air and ensuring even air distribution. …


  • Wind farm foundations in Telšiai district

    The foundations of 6 wind power plants were installed. In this project UAB Merko statyba was responsible for building the foundations of wind power plants, i.e., digging foundation pits, installing base for piles and foundation, and more.


  • Wind farm infrastructure facilities in Akmenė

    14 wind turbines were planned. A contract has been signed with Merko statyba regarding both design and subcontracting, meaning that the company was responsible for both preparing the project and subcontracting. There were built substations for power transmission (transformer output 75 MW)


  • Vilnelės skverai residential quarter, stage II

    The second stage of the development includes six apartment buildings with 209 apartments. The 5- and 6-storey buildings located at address Manufakturu str. 7 have the energy class rating A+. All apartments have spacious balconies or terraces and are equipped with heat-recovery ventilation system, providing fresh air and ensuring even air distribution. Parking spaces, storage …


  • Wind farm infrastructure facilities in Mažeikiai

    Fourteen foundations for wind farms were planned. UAB Merko statyba‘s role in this project was to establish the foundation, i.e., dig the holes for the foundation, establish the base for the piles and foundation and other elements. A total of 14 pile foundations were established.


  • Wind farm infrastructure facilities in Šilalė

    Twelve wind turbines were planned. A contract signed with Merko statyba regarding both design and subcontracting, meaning that the company was responsible for both preparing the project and subcontracting. There were built substations for power transmission (transformer output 60 MW) and roads (total of about 8 km). In addition, 30 KV cable was installed (a …


  • Wind farm foundations in Jonava II

    Seven wind turbine foundations were established, i.e., the holes were dug, and the bases for the piles and foundation were poured. Seven wind farm foundations were established.


  • Wind farm foundations in Jonava I

    New-generation wind turbine foundations were established (mast height 151 m, 5.5 MW). CFA piles and CMC rigid inclusions were installed and concrete was poured for the foundation caps. Two pile foundations, two gravity foundations.