Designing and construction works of expansion of the basin of Väätsa Waste Management Centre
Area of the basin 8,000 m2
-
Reconstruction and expansion construction works of the public water supply and sewerage systems of Kehra city and its surrounding
Water supply 21 km Sewerage 21 km 2 km of storm water pipes 16 wastewater pump stations
-
Water intake structures and water treatment plants in the Kohtla-Järve region
In the framework of the Kohtla-Järve region water intake structures and water treatment plants project 20 new bore wells (Püssi – 1, Kohtla-Järve – 4, Ahtme – 6, Kurtna Vasavere – 9) were built and 6 bore wells reconstructed (Püssi – 1, Kurtna Vasavere – 5). A 2nd stage pump station in Kurtna Vasavere was …
-
-
Loo-Maardu road section
Through construction the 6.8 km road section between Loo and Maardu (on the main road E20 Tallinn-Narva) was converted into I class road. This means that all crossings with side roads and light traffic roads will take place at different levels. As a result trafficking will become safer and smoother on one of the most …
-
I stage of reconstruction of Sillamäe water and sewerage pipelines
The work in the first phase of the Sillamäe water and sewerage piping was performed by Merko from 2010-2012. In the course of this phase, 11 km of water piping and 15 km of sewerage piping was installed, along with 11 bore well pumping stations, two waste water pumping stations, two level 2 pumps and …
-
-
Public water supply and sewerage systems for Viiratsi county
The Viiratsi county project involved the reconstruction of public water supply and sewerage systems in five different settlements. The total length of the built/reconstructed municipal sewerage pipeline was 1.9 km, municipal pressure sewerage pipeline 1.6 km, drinking water pipeline 8.4 km, and storm water sewerage pipeline 0.4 km. Also 5 over ground fire hydrants and …
-
-
Design and construction of the public water supply and sewerage pipelines and waste water pumping stations for the city of Türi
24.6 km of water pipes, 16 km of non-pressurized sewerage pipes, 12 waste water pump stations were designed and built.