• Connecting Elektrilevi OÜ to Püssi 330/220/110/20/10 kV substation

    At the Püssi substation of 330/220/110/20/10 kV, there will be built a cell of 110 kV and a commercial measuring point for connecting a new transformer of Elektrilevi Ltd. to the substation. The project will be completed as a turnkey solution, i.e. the equipment in the scope of the project is supplied together with the …


  • Pikaliiva apartment buildings, stage II

    In the second stage of the development project of Pikaliiva, two residential buildings with 50 apartments were completed next to the Lake Harku surrounded by greenery. The apartment buildings are energy class B. The buildings have economical water-based floor heating, with emphasis on soundproof apartment partition walls and increased thermal insulation of exterior walls. Glasses …


  • Türi Elementary School

    The building complex of Türi basic school consists of a two-storeyed school building with a triangular ground plan and a three-storeyed sports building with a rectangular ground plan. The complex with a total area of 7,800 m2 and nearly zero energy consumption is an educational institution and sports facility for up to 600 students. The …


  • Noblessner’s breakwater

    What was once the most important submarine construction facility in tsarist Russia has now become a harbour complex open to both the people and the sea. In cooperation with BLRT, Merko has built a modern living environment and designs a public urban space that has become a popular place for Tallinners and visitors to spend …


  • Wastewater collection area of Keila river

    The contract included establishing public water supply and sewerage system supply points to ca 1,500 registered immovables as well as renewing road surfaces of the Metsanurme, Kasemetsa and Üksnurme area.


  • Connecting MCF Group Estonia OÜ to Harku Substation

    The substation expansion project included the building of two new 110kV line compartments in the substation in connection with MCF Group Estonia OÜ joining the Harku substation. The work was carried out by the turnkey method, which means that in addition to the design and construction work, all the necessary equipment were supplied, installed, adjusted, …


  • Extension of the Sindi 330kV substation

    In the course of the extension of the substation, a new 330kV line compartments were built in the substation, a power transformer foundation with an oil separation system was built, relay protection and automation systems were installed, 20kV reactors were installed and a new 330kV transformer procured by Elering was installed. The works also included …