• Construction of waste water collector at Vanasadam Port

    The purpose of this project was to enable the Port of Tallinn to handle wastewater streams from ships. From a collection tank of a docked ship, the wastewater is pumped through the pipeline and sent on to the Tallinn city sewerage system. A water metering centre was established on the Port of Tallinn property line. …


  • Connecting Elektrilevi OÜ to Mustamäe 110/6 kV substation

    The renovation of the Mustamäe substation was part of a major joint project between Elering and Elektrilevi to satisfy the growing energy needs in the Mustamäe and Õismäe district and increase the reliability of supply. A new 110 kV Elering substation was built next to the 6 kV Elektrilevi substation already standing on Vilde tee …


  • Tallink Tennis Centre

    Tallink Tennis Centre in Lasnamäe district has become a new home for many tennis lovers and the Estonian Tennis Federation. The largest and most modern tennis centre in Estonia has 20 tennis courts. Four out of nine hard courts meet the requirements of large international competitions; five courts are covered with a 7.5-mm-thick carpet which …


  • Maakri Kvartal business complex

    The complex comprises seven buildings: there were constructed a 30-storey, 10-storey and 4-storey buildings and reconstructed four 3-4-storey architectural monuments dating back to the beginning of the 20th century. The total gross area of Maakri Kvartal business complex is approximately 36,000 m², which includes leasable area approximately 21,500 m². There are approximately 170 parking spaces …


  • Apartment building at Paepargi 51

    Paepargi 51 is the second of three buildings to be established in the Paepargi high-rise apartment development. The 14-storey building has 60 units. The improved technical utility system in the new apartment buildings includes apartment-based ventilation and hydronic floor heating. To assess compatibility of different design parts BIM models were generated based on 2D drawings. …


  • Apartment buildings at Tartu mnt 52, stage II

    The Tartu mnt 52 apartment development project consists of five apartment buildings at Tartu mnt 52 and Lastekodu tn 23, with commercial spaces on the ground floors. In the second stage of the residential block, 80 flats in two buildings were completed in the second half of 2017: a 5-storey building on Lastekodu Street and …


  • Replacement of reactors in Balti substation

    The power transformer’s medium-voltage shunt reactors are being replaced at Balti substation. In the course of the work, the existing switchgear will be dismantled and a 20 kV switchgear will be built in its place with one 30 MVA and one 20 MVA reactors. The construction is taking place using the turnkey method. On 1 …


  • Establishing connection points for the Kivimäe 32 plot

    To allow construction of buildings on the Kivimäe 32 plot, a loop water distribution system will be constructed and water, sewerage and communication line connection points for the apartment building will be established on the segment between Särje and Vääna streets. 480 m of water pipes, 30 m of waste water pipes, 41 m of …


  • Renovation of the 35 kV and 10 kV switchgear at Rakke 35/10 kV substation

    The Rakke substation in Lääne-Viru County was expanded to increase the reliability of the supply of electricity in the region. The work was performed in difficult and narrow conditions next to the old substation. As part of the contract, a new internal-type substation with 35 kV and 10 kV switchgear and automation equipment was designed …