Estonia
-
Engineering works and construction of the power systems of the
Mustamäe combined heat and power plant (CHP)Within the context of works, the 10.5kV power systems of Mustamäe combined heat and power plant (CHP) were built and connected to the existing boiler plant’s 6kV substation and Elektrilevi 10kV network. The thermal power of the new combined heat and power plant is 2×24 MW and electric power ca 10MW. On 1 July 2021, …
-
Office building at Tartu mnt 80, I stage
The office building is located in the commercial and residential block called Fahle Park, developed by Fausto Capital.
-
Tsirguliina 330kV substation
Within the framework of the agreement, the Tsirguliina 330kV substation, dating back to 1984, was renovated. The project was completed as a turnkey solution, i.e. the equipment in the scope of the project was supplied together with the necessary design works, was installed, tuned, checked and finally delivered to the client in energised state. On …
-
Kilingi-Nõmme 330 kV substation
We built the new Kilingi-Nõmme 330 kV substation using the turnkey method – the necessary design work was done, equipment procured, installed and tuned, and the substation was turned over to the client in an energised form. Kilingi-Nõmme substation is the starting point of the third 330 kV connection of the Estonian power supply system …
-
Construction of the pipelines and the bore hole pumping station for the Tutermaa WS
The objective of the project was the linking of the Kumna and Tutermaa wastewater system with the Keila treatment station, the liquidation of the existing obsolete treatment stations, and the linking of the water supply systems in both of the villages, as well as the construction of a water treatment station. Characteristics: Reconstruction of the …
-
Design and construction of the WS of the Alliku Village water management project
A water supply and wastewater collection system for the Alliku Village at the Saue Municipality were designed and constructed. The water supply is ensured by connecting it with the water pipeline constructed in the neighbouring village. The wastewater shall be collected with two pump stations, and it shall be pumped into a previously constructed pressurised …
-
Renovation of Kuressaare town centre
The aim of the modernisation of the central square of Kuressaare and its immediate surroundings was creating an attractive and friendly modern public space that would enhance its historical heritage and provide a pleasant environment for people of all ages throughout the year. The project improved the conditions for providing catering and retail services and …
-
Apartment buildings at Suur-Patarei 20
The three new 5-storeyed apartment buildings of RAND city villas and a reconstructed earlier yard house that represents the milieu of the Kalamaja district are located near the Old Town and the rapidly developing quarters near Tallinn City Hall and the Seaplane Harbour. The luxurious seaside buildings accommodate 31 flats and six business spaces. All …
-
Tähepargi residential area
We built seven new apartment buildings in Öö, Pargi and Päeva Streets in a tenminute walk from the heart of Tartu. Each of the 2–3-storeyed secluded apartment buildings with a uniform architecture has 6–7 apartments. The well-planned homes are spacious and full of light; the greenery of the surrounding town park can be enjoyed through …
-
Tähepargi Residence
Two-to three-storey private apartment buildings are located in the new living quarter. Every house has 6-7 apartments, three-storey houses also have an elevator. The buildings have B energy class. All the parking spaces have been taken underground, leaving more greenery and open space around the buildings. The design of Tähepargi homes is taking the modern …