-

Rail Baltica railway between Tallinn and Pärnu
-

Tartu joint building of national defense institutions
-

Rail Baltica project main railway infrastructure phase IV works
on the Saku-Harjumaa border section -

Construction works of Rail Baltica’s Ülemiste terminal railway facilities
-

Noblessner development – Allveelaeva 2 residential and business building
-

Construction of tramway connecting Old City Harbour
and Rail Baltic’s Ülemiste passenger terminal -

Noblessner development – Vesilennuki residential and business buildings
-

Engineering design and construction of the infrastructure for the land part
of the Republic of Estonia’s south-eastern border, stage II -

Noblessner development – Allveelaeva 4 residential and business building
-

Engineering design and construction of the infrastructure for the land part
of the Republic of Estonia’s south-eastern border, stage I -

Replacement of three Tallinn 110kV overhead lines with cable lines
-

Submarine Cables in the Suur Strait and the Väike Strait
-

Design and build contract for cleanup of residual pollution originating
from the former Maadevahe asphalt concrete plant, part 2 -

Noblessner’s breakwater
-

Noblessner development – Staapli 3, 4, 8, 12 residential and business buildings
-

Design and build contract for cleanup of residual pollution originating from the former Maadevahe asphalt concrete plant
-

Design and build contract for cleanup of residual pollution originating
from the former Priimetsa asphalt concrete plant -

Construction of Juuliku road junction and road section on Tallinn Ring Road
-

Designing and construction of the infrastructure for Tallinn Airport tram line
-

Construction work on the passenger walkway at Vanasadama Harbour quay no. 5
and preparation of working project -

Construction of waste water collector at Vanasadam Port
-

Design and construction of the passengers vehicular loading ramps of quays 12 and 16 of the Vanasadam Harbour
-

Design and renovation of the infrastructure of Tallinn tram line no. 4
-

Water treatment plant of City of Narva
-

II stage of reconstruction of Sillamäe water and sewerage pipelines
-

Closing of industrial waste and semi-coke landfill in Kohtla-Järve
-

Ülemiste traffic junction
-

Nursery Lähte
-

The collector of storm water of Ülemiste traffic knot and replacing of water pipeline
-

Reconstruction and expansion construction works of the public water supply and sewerage systems of Kehra city and its surrounding
-

Loo-Maardu road section
-

I stage of reconstruction of Sillamäe water and sewerage pipelines
-

Construction works of water and sewerage utility lines of Kose rural municipality
-

Ämari Air Base
-

Renovation and expansion of water and sewerage infrastructure in Matsalu sub-basin. Construction work in phase II of the Haapsalu region Part 1: Construction work on water and sewerage infrastructure in the city of Haapsalu
-

Bridge of Rannu-Jõesuu
-

Water and sewerage project of Matsalu sub-basin
-

Extension of the water and sewerage network of Paikuse
-

Extension of the water and sewerage network of the City of Pärnu